Matthew Kristiansen is a Senior Energy Program Specialist and certified grant writer who has been with PEC since November 2021. He works closely with the sales, project management, and customer teams to secure rebate, incentive, and grant funding for EV charger projects. Matthew is passionate about the collaborative work at PEC and the positive impact it has on communities and the environment.
Earlier this month, we previewed ODOT’s upcoming EV charging rebate round. Round 5 opened October 1, and the final program looks different from what we expected. Most of the funding is already reserved, so here’s a quick look at what changed and what it means if you’re still weighing a project.
Here’s what changed for 2026:
- Funding is weighted almost entirely toward DCFC: about $5.04 million of $5.5 million, with $400,000 for Level 2.
- The cost-share ceiling rose from 80% to 95% of eligible costs, but only for projects in the ten priority counties listed below. Everywhere else, the ceiling stays at 80%.
- There’s no application deadline. Round 5 stays open until every pool is reserved.
- A waitlist replaces the hard close. Late applicants are funded in order if reserved money comes back.
- Ten counties have their own set-aside. Grant, Harney, Jefferson, Klamath, Lake, Morrow, Sherman, Union, Wallowa, and Wheeler have never received a rebate, so ODOT is holding funds for them through January 31, 2027.
- Equipment and network rules changed. ODOT updated its Level 2 equipment and networking requirements, then revised the guidelines on October 16, including moving $560,000 from the non-priority DCFC pool to the priority DCFC pool.
What held steady: up to $8,000 per Level 2 port, first-come, first-served funding, and 70% of funds reserved for priority communities (predominantly rural or low-income areas).
One limit to keep in mind: rebates are capped at $249,000 per project site (a single physical address), counted across Rounds 4 and 5 combined. A site can mix DC fast charging and Level 2 ports, as long as the total stays under that cap.
Funding Amounts Were Heavily Weighted Towards Level 3 Fast Chargers
Our original article anticipated another Level 2 round, since that is what the ODOT program has historically offered. Instead, nearly all of Round 5 went to direct current fast chargers (also known as DCFC, or Level 3 chargers). Here is a breakdown of the funding amounts:
| Funding pool | Level 2 | DCFC |
| Non-priority communities | $96,000 | $960,000 |
| Priority: Grant, Harney, Jefferson, Klamath, Lake, Morrow, Sherman, Union, Wallowa, Wheeler | $152,000 | $1,760,000 |
| Priority: all remaining counties | $152,000 | $2,320,000 |
| Total | $400,000 | $5,040,000 |
Amounts above are from ODOT’s Round 5 Guidelines (revised October 16, 2026). ODOT can move funds between pools at its discretion, so check the live funding tracker for current figures.
Why did this round focus on DCFC instead of Level 2?
ODOT’s incentive program has been funded by a mix of state and federal sources, and federal funds come with their own requirements for how the money can be distributed. Round 5 uses only federal funding: a 2024 grant from the U.S. Environmental Protection Agency (EPA), secured by the Oregon Department of Environmental Quality (DEQ) through its Climate Equity and Resilience Through Action (CERTA) program. Because this round relies entirely on that grant, DC fast charging projects are eligible for the first time, and the round’s requirements and funding allocation follow the grant’s terms.
Making DC Fast Chargers Possible for More Businesses
While Level 2 chargers are often more practical, fast chargers can be a preferred option for EV drivers, and a major draw for businesses. The benefit of the DCFC focus this round is that it makes these projects much more viable for businesses looking to add fast charging to their properties.
Fast charging projects often come with hefty price tags to build the necessary infrastructure and electrical capacity to power the chargers – creating a financial risk and payback uncertainty for smaller sites or areas with less traffic. This has left fast charging projects typically reserved for high-traffic and high-demand areas like highway corridors and large shopping centers in denser urban areas.
Through this program, qualifying projects can receive rebates of up to $80,000 per port, covering up to 80% of eligible project costs (up to 95% in the ten priority counties), giving smaller commercial sites with moderate traffic a viable path towards a fast charging project with a reasonable payback.
How the funding works: ODOT pays the lower of two amounts: up to $80,000 per DCFC port (or $8,000 per Level 2 port), or 80% of eligible project costs (95% in the ten priority counties). ODOT can award less than the maximum based on eligible costs, and on most projects the per-port cap kicks in before the percentage cap, so most site owners should expect to cover more than 20% of total project cost.
For retail, hospitality, convenience, and grocery sites, the return goes beyond charging revenue. A fast-charging session is long enough for a coffee, a meal, or a grocery run.
Where Round 5 Funding Currently Stands
Last Update: October 19, 2026. Three weeks in, Level 2 funding is gone outside the ten set-aside counties, and priority DCFC funding elsewhere is nearly reserved. Here’s each pool’s status per ODOT’s tracker as of (October 19):
| Funding pool | Charger | Pool size |
| Non-priority | Level 2 | $96,000 |
| Priority: ten counties | Level 2 | $152,000 |
| Priority: remaining counties | Level 2 | $152,000 |
| Non-priority | DCFC | $960,000 |
| Priority: ten counties | DCFC | $1,760,000 |
| Priority: remaining counties | DCFC | $2,320,000 |
Check out ODOT’s live tracker here for the latest funding status report.
Qualification Requirements:
Equipment, networking, signage, and documentation requirements vary by charger type and location, and ODOT has already revised them once this round. Rather than summarize them here, we recommend reviewing the current Round 5 Guidelines on ODOT’s program page before planning a project.
Interested Businesses Should Still Join the Waitlist
Reserving a rebate and finishing a project are two different milestones. Some reserved projects stall on utility upgrades, permitting, or budget, and some get cancelled outright. When that happens, the rebate goes back to ODOT. In Round 5, ODOT will use those returned funds, from Round 5 or Round 4, to fund applicants on the waitlist.
The waitlist works in order. When funds come back in a given funding category, the next applicant in that category gets notified. ODOT is clear that it can’t predict how much will come back or when.
Two things make the waitlist worth taking seriously:
- Your place in line is set by when you join. Waiting to see how the round shakes out moves you further back.
- The ten-county set-aside expires January 31, 2027. Any unclaimed money from those counties rolls into the statewide priority pool, which could free up funding for priority applicants already waiting.
A waitlist spot only pays off if your project can move quickly once you’re called. Joining the waitlist requires a full application, including a signed Site Verification and Recipient Acknowledgement Form, an itemized material and labor quote, and a photo of the planned charger location. If funds open up, ODOT gives you two weeks to accept the reservation, and the offer may cover only part of your request. That means having your electrical capacity understood and your project ready to move before you’re called.
Work With PEC to Plan Your Next Step
If you’re not sure which pool your property falls into, start with ODOT’s Priority Type Locator map and enter your site address. From there, the question is whether your site pencils out better for DC fast charging or Level 2, and whether it makes sense to apply now or join the waitlist.
Our team has worked with the Community Charging Rebates program since its first round. We’re happy to walk through your site’s electrical capacity, rebate math, and timing, and get your application or waitlist entry ready to move.