For warehouse operators in Southern California, EV charging infrastructure is becoming more than an investment in future operations. It can also play a role in navigating one of the region’s most important emissions-reduction programs: WAIRE.

The Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program originated with Rule 2305 and was implemented through the South Coast Air Quality Management District (SCAQMD) to regulate warehouse facilities and reduce point emissions from the goods movement industry. The program applies to warehouses with 100,000 square feet or more of indoor floor space and requires operators to earn WAIRE Points each year through qualifying actions, an approved Custom WAIRE Plan, mitigation fees, or a combination of compliance strategies.

But what does that actually mean for warehouse operators? And where can EV charging infrastructure fit into the picture?

We sat down with Kim Flebotte, EV Charging Project Manager and our in-house WAIRE subject matter expert here at PEC, to break down this program, how it relates to EV charging infrastructure, and what facility teams should be thinking about as they plan their next move.

Kim Flebotte, EVSE Project Manager at Pacific Energy Concepts (PEC)

What Is The WAIRE Program, And Why Was It Created?

The WAIRE program originated with Rule 2305 and was implemented through the South Coast Air Quality Management District (SCAQMD) to regulate warehouse facilities and reduce point emissions from the goods movement industry. As transportation and electricity production are the biggest contributors to point emissions, the WAIRE point system focuses on high contributors in these two areas.

Who Is Required To Comply, And Is WAIRE Statewide Or Limited To Certain Parts Of California?

The WAIRE program is only applicable to the South Coast AQMD, and includes most of Los Angeles, Riverside, San Bernardino, and Orange Counties, but doesn’t include desert regions that are separated from the basin by mountain ranges, like LA County’s Antelope Valley. All warehouses with square footage greater than 100,000 square feet are required to comply.

Southern California Air Basins Map Waire Points

In Simple Terms, What Are WAIRE Points, And How Is A Company’s Annual Obligation Calculated?

Each company will calculate their annual WAIRE Points Compliance Obligation using the provided User Calculator. Once their points are calculated and submitted for confirmation on an annual basis, the company has two options for meeting their obligation: it can pay $1,000/point to the South Coast AQMD, or it can offset the points by implementing reduction projects from the WAIRE Menu.

What Options Do Warehouse Operators Have For Earning The Required Points?

The WAIRE Menu provides warehouse operators with a detailed list of projects that can be implemented to offset their Compliance Obligation, along with the points scale to calculate the points earned through each project. Warehouse operators strive to offset 100% of their annual Compliance Obligation as these projects provide long-term cost and energy savings over paying the out-of-pocket fees.

What Happens If A Company Does Not Earn Enough Points?

If a company does not complete enough WAIRE projects to offset their Compliance Obligation, they will pay $1,000/point that hasn’t been offset.

What Are The Biggest WAIRE Misconceptions Or Compliance Mistakes You See?

The most common compliance mistake is inadequate annual planning. Because many WAIRE Menu items have long lead times, companies should plan several years ahead to ensure projects start and finish within the intended compliance period.

How Can EV Charging Infrastructure Help Companies Earn WAIRE Points?

Installing EV chargers (EVSE) enables warehouse operators to apply WAIRE points in three parts: purchase, construction, and permit signing/energizing chargers. The points can be applied in one annual cycle or broken down over the course of two cycles, should construction schedules dictate this. Companies can also apply WAIRE points for the energy dispensed from the EVSE on an annual basis.

What Types Of Vehicles And Charging Equipment Qualify?

WAIRE points can be applied to EVSE projects for all types of vehicles, including ZE trucks, vans, personal vehicles, yard trucks, and forklifts.

Can Companies Combine WAIRE Points With Utility Incentives, Rebates, Or Other EV Funding Opportunities?

Yes, companies can combine (or “stack”) WAIRE points with utility incentives, rebates, and other EVSE funding opportunities. The SCAQMD allows warehouse operators to maximize their return on investment by layering public and private incentives alongside the structural point system.

  • For projects utilizing WAIRE program funding, companies can stack outside incentives to cover up to 85% of the total eligible costs of the new equipment.
  • While financial incentives can be combined freely, you generally cannot earn WAIRE points for actions that are strictly mandated by overlapping air quality rules (such as CARB’s Advanced Clean Fleets) unless your implementation exceeds the legal minimum.
  • Although the WAIRE program does not restrict the use of external funds, external incentive programs (such as certain utility rebates) may occasionally dictate specific constraints on whether the equipment can simultaneously be used for regional rule credits.

How Should A Company Compare Investing In EV Infrastructure With Paying The WAIRE Mitigation Fee?

After warehouse managers understand their Compliance Obligation, they should use the WAIRE Menu to determine what projects they’d like to focus on, and then invite providers like PEC in to discuss ways to maximize the points and provide project quotes. Once the quotes are received, they can compare the annual and ongoing WAIRE point offsets with the cost of the projects, and determine whether the project costs outweigh the cost of the Compliance Obligation.

What Should A Warehouse Evaluate Before Beginning An EV Charging Project?

A warehouse should understand the EVSE project costs, WAIRE points it will earn from the project, and construction timeline to ensure the offset will be incurred during the expected annual cycle.

How Can Pacific Energy Concepts Help A Company Plan And Implement An EV Project That Supports Its WAIRE Strategy?

PEC has a comprehensive understanding of the WAIRE program and is equally experienced in EVSE project implementation. PEC can provide warehouse operators with a thorough site evaluation to determine the most cost-effective site for the EVSE project, while selecting products that ensure the desired WAIRE points outcome.

What Is The First Step A Warehouse Operator Should Take If They Are Unsure About Their WAIRE Requirements Or Available Options?

Warehouse operators should set up an initial meeting with a PEC sales engineer to discuss their goals and understand how PEC’s experience will guarantee their desired outcome. PEC will then send an auditor to evaluate the nuances of their site and outline a cost-effective EVSE project, and will include the pre-calculated WAIRE point offset in the final proposal.

Trending Posts

Subscribe to our newsletter: PEC Insights

Get email updates on energy programs, utility incentives, and proven strategies to optimize energy performance across your facilities.

Energy Monitoring

Services

PEC Pacific Energy Concepts Logo - Color

Request a free energy audit

Save Energy | Save Money | Improve Safety | Boost Mood & Morale | Increase Productivity | Meet Your Sustainability Goals | And More…